Home    中文  
 
  • Search
  • lucene Search
  • Citation
  • Fig/Tab
  • Adv Search
Just Accepted  |  Current Issue  |  Archive  |  Featured Articles  |  Most Read  |  Most Download  |  Most Cited

Chinese Journal of Hygiene Rescue(Electronic Edition) ›› 2021, Vol. 07 ›› Issue (04): 226-230. doi: 10.3877/cma.j.issn.2095-9133.2021.04.007

• Trauma Center Constructions • Previous Articles     Next Articles

Construction and thinking of trauma treatment system in Suzhou

Lijun Liu1,(), Yu Ma2, Haibo Xu1, Jianjun Zhu1   

  1. 1. Department of emergency and critical medicine, the Second Affiliated Hospital of Suzhou University, Suzhou 215004, China; Trauma treatment center, the Second Affiliated Hospital of Suzhou University, Suzhou 215004, China
    2. Medical Administration Division of Suzhou Health Commission, Suzhou 215000, China
  • Received:2021-06-10 Online:2021-09-10 Published:2021-09-27
  • Contact: Lijun Liu

Abstract:

The "531" action plan for healthy citizens of Suzhou, which began in March 2016, has significantly accelerated the construction of trauma centers of hospitals at all levels in Suzhou and their regional trauma treatment system. This paper introduces in detail the five-year construction process of trauma center and regional trauma treatment system in Suzhou, and introduces the experience and existing problems of trauma center and its system construction in Suzhou, so as to provide reference materials for emergency and trauma treatment centers that have not been built or are under construction. This paper attempts to improve the trauma center and its system construction on the platform of emergency medicine, and to explore the trauma center model of "replicable and popularized" .

Key words: Trauma center, Trauma treatment system, Trauma resuscitation suite, Construction and thinking

京ICP 备07035254号-20
Copyright © Chinese Journal of Hygiene Rescue(Electronic Edition), All Rights Reserved.
Tel: 0519-81083787 E-mail: zhwsyj@163.com
Powered by Beijing Magtech Co. Ltd